服务热线
4001-123-456
Step 1: Before Replacing A Turbo
It is important to conduct a thorough diagnostic check of the engine system to determine if the “fault” is actually the turbocharger.
A lack of power, noisy operation, excessive smoke or oil consumption could result from a faulty fuel injection system, ECU or electrical problems, restricted or blocked air filter, a amaged exhaust system or a lubrication problem. If possible, check crankcase pressure according to the engine manufacturer’s specification. A higher than normal crankcase pressure reading may lead to oil leakage from the turbo into the inlet and exhaust systems.
Step 2: Before Replacing A Turbo
If the engine diagnostic check does not uncover any obvious cause,
make sure that an extensive trouble shooting analysis is completed. Key turbocharger areas for examination include foreign objects, lack of lubrication, oil contamination, over-speeding of the turbo and excessive temperature. This is important because turbo damage can often be a symptom of an underlying problem rather than the cause itself. The following steps must be strictly followed. Always consult the workshop manual for instructions which are specific to your engine or vehicle.
Step 3: Turbo Installation
Check the part number to ensure that it is the right one for the engine.
Installing the incorrect turbo to an engine may damage the turbo and/or the engine and will void the warranty.
Step 4: Turbo Installation
It is important that during the whole installation process, you prevent dirt or debris from entering any part of the turbo.
Any dirt or debris entering the turbo may cause catastrophic damage due to the very high speed of operation (up to 300,000rpm).
Step 5: Turbo Installation
Ensure that correct gaskets are used.
For example - the center hole of any gasket must be perfectly aligned with the center hole of the turbo flange. Some turbos use a threaded connector and no gasket. Some turbos use a “banjo fitting” with “banjo bolt”; in these cases, use new sealing gaskets/washers. Important Note: Do not use liquid gasket or sealants, particularly for the oil inlet or outlet since excessive material may enter the turbo, reducing or stopping oil flow.
Step 6: Turbo Installation
It is recommended that you use new air, oil and fuel filters and clean engine oil to the engine or vehicle maker’s specification.
When installing the new oil filter, if possible, fill it with clean, fresh engine oil. Also, if it is accessible, back-fill the pressure line from the oil pump to the filter. This is particularly important on high mileage engines, where the oil pressure line may empty during oil changes!
Step 7: Turbo Installation
Before installing the turbo, ensure that all air hoses connected to the turbo are totally clean and show no sign of any damage.
Step 8: Turbo Installation
The air filter and its housing must be completely clean and free from any debris.
Step 9: Turbo Installation
Clean the engine breather system (Positive Crankcase Ventilation system) and ensure that it functions properly. Any blockages or malfunction may cause high crankcase pressure and lead to oil leakage from the turbo into the inlet and exhaust systems.
Step 10: Turbo Installation
Remove any old gasket material from the exhaust manifold and pipe. The surfaces of the flange must be clean and have no damage. Then remove plastic or foam blanking plugs from the turbo.
Step 11: Turbo Installation
Position the turbo onto manifold or engine block using the correct new gasket or O ring, and then reconnect the exhaust pipe. Tighten all nuts and bolts. Important Note for Steps 12-15 Pay special attention to oil feed and drain lines, which must be totally clean and have no damage to ensure unrestricted oil flow. Make sure that flexible hose liners have not collapsed internally and that the oil feed line is not too close to source of heat which may have damaged the oil feed line internally. This is common on some vehicles and difficult to detect without cutting the pipe! For this reason, we recommend fitting a new oil inlet pipe when installing the new turbo.
Step 12: Turbo Installation
Next, install oil drain line to the turbocharger.
Step 13: Turbo Installation
Pour new engine oil into the oil inlet hole of the turbocharger.
Step 14: Turbo Installation
Next, fit the new oil feed line.
Step 15: Turbo Installation
Install inlet and outlet air hoses to turbocharger compressor housing. Make sure that the connections are airtight and hose clamps are correctly tightened.*
Step 16: Turbo Installation
Crank the engine for 10 - 15 seconds without starting the engine. If possible, disable the fuelling/ignition or use compression test mode to allow this. This helps to prime the oil feed to the turbocharger by filling the oil pressure lines, oil filter and turbo with oil before start-up. Important Note: As soon as the engine starts, the turbo will run at high speed and a lack of lubrication in these vital first few seconds can destroy a brand new turbo.
Step 17: Turbo Installation
Then start the engine, and let it idle for 3 to 4 minutes to allow for proper inspection of oil, gas and air leakage. If any leakage is detected during engine start up, fix the issue immediately.
Step 18: Turbo Installation
Stop the engine and re-check engine oil level. Oil level should be between the minimum and maximum mark on the dipstick - it is important to make sure that oil level is not above the point where turbo oil drain pipe connects to the engine or this may lead to oil leakage from the turbo into the inlet and exhaust systems.
A: We are located in SHENGYANG, Liaoning Province, China(Mainland)
A: Generally, we pack our goods in plastic bags and neutral brown cartons. If you have legally registered patent, we can pack thegoods in your branded boxes after getting your authorization letters. Examples for neutral brown cartons:
A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages before you pay the balance.
A: EXW, FOB, CFR, CIF, DDU.
A: Generally, it will take 7 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
A: Yes, we have 100% test before delivery. We calibrate all our turbos well by CIMAT ,and balance CHRA VSR(Vibration Sorting Rig) by TURBO TECHNICS(UK) before shipping .
A:1. We keep good quality and competitive price to ensure our customers’ benefit ; 2.We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
A: Nearest air port : Shenyang Taoxian airport Beijing airport as regular, sometimes Shanghai or dalian airport Nearest Sea Port :Dalian Port
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Mollitia iste laborum ad impedit pariatur esse optio tempora sint ullam autem deleniti nam in quos qui nemo ipsum numquam, reiciendis maiores quidem aperiam, rerum vel recusandae